Home / News / News Post

Common Injection Moulding Problems in Medical Devices | Meridian Medical

Meridian Medical blog banner featuring an open injection moulding machine with the title 'How Much Do Injection Moulding Tools Cost?

Common Injection Moulding Problems in Medical Device Manufacturing (and How to Avoid Them)

November 2026

Injection moulding can be one of the most reliable ways to produce medical device components at volume. When it goes wrong, though, the consequences go well beyond scrap parts. A defect in a medical device can mean failed validation, delayed launches and, in the worst cases, a risk to patients.

The good news is that most injection moulding problems are predictable, and most can be prevented long before the first part is made. Below are the issues we see most often, what causes them, and what to look for in a medical contract manufacturer who can help you avoid them.

Why injection moulding problems matter more in medical devices

In many industries, a cosmetic flaw is an annoyance. In medical device manufacturing, the same flaw can affect how a component fits, seals or performs. Dimensional consistency is also a regulatory matter, because your process must be reliable and repeatable, not just capable of producing a good part on a good day.

This is why moulding for medical devices needs a different mindset to general plastics work. Prevention, documentation and control matter as much as the moulding itself.

The most common injection moulding defects

These are the defects we see most often, but this is not an exhaustive list. Every device, material, machine and tool is different, so other issues can arise depending on the specific project.

Short Shots

A short shot happens when the mould cavity does not fill completely, leaving an incomplete part. Common causes include insufficient injection pressure, material that is too cold or too viscous, poor venting, or gates that are too small. For devices with thin walls or fine features, short shots can be a persistent problem if the tool was not designed for the intended material and machine.

Sink marks and voids

Sink marks are small depressions on the surface of a part, usually where the plastic is thickest. Voids are the same problem occurring inside the part. Both are caused by part design, and the shrinkage of plastic as it cools. They can weaken a component and affect its dimensions, so they are particularly important where parts need to connect or seal.

Warpage

Warpage occurs when different areas of a part cool and shrink at different rates, causing it to twist or bend. It is often a sign of uneven wall thickness or poor cooling design in the tool. Warped components can fail to assemble correctly, which becomes a real issue when moulded parts feed into downstream cleanroom assembly.

Flash

Flash is excess material that escapes the mould cavity, usually at the parting line. It points to a worn or poorly closing tool, or to excessive injection pressure. Beyond the appearance, flash can create sharp edges and loose particles, neither of which is acceptable on a medical component.

Weld lines and burn marks

Weld lines form where two flow fronts meet and do not bond fully, creating a weak point. Burn marks appear when trapped air overheats and scorches the plastic. Both are usually linked to gate position, venting and process settings, and both can compromise the strength or integrity of a part.  They are typically shown in mould simulations so can be addressed before any tooling manufacture commences.

Material and contamination issues

Even a well-designed tool will produce poor parts if the material is handled incorrectly. Resin that has been dried incorrectly, out of date material batches or contamination from previous production all cause processing issues. For medical devices, material traceability is just as important as material quality, so you need to know exactly what went into every batch, and how it was run.

How to avoid injection moulding problems

Get the design right before the tool is cut

Most defects can be traced back to the design stage. Even wall thickness, sensible gate positions, adequate draft angles and proper venting all reduce risk significantly. Changing a part design is far cheaper than modifying a finished tool, so early design for manufacture  (often referred to as DFM) input is one of the best investments you can make.

At Meridian Medical, our experienced technical manager works with customers to ensure their designs are fit for manufacturing and our tooling manager reviews designs before any tooling is cut, so potential problems are caught while they are still easy and inexpensive to fix.

Choose the right material

Material selection should reflect the way the device will be used, sterilised and stored, not just the price per kilo. Medical-grade materials with proper certification and traceability protect you from variation between batches and make your regulatory documentation far easier.

Validate and control the process

A validated moulding process is one that has been proven to produce compliant parts consistently. Establishing the right process parameters, then monitoring them, helps prevent drift over time. Ask any prospective manufacturer how they validate their processes and how they respond when a parameter moves out of range.

Maintain the tooling

Tools wear, and worn tools cause flash, dimensional drift and inconsistent parts. A planned maintenance schedule keeps problems from creeping in unnoticed during long production runs.

Inspect, record and trace

Robust inspection and full traceability mean that if something does go wrong, it is found early and contained quickly. This is also what regulators, and your own quality team will expect to see.

What to look for in a medical contract manufacturer

When you are comparing manufacturers, the questions worth asking go beyond price and capacity:

  • Is moulding carried out in-house, so that quality is under direct control?
  • Is there a design review before tooling is cut?
  • How is the process validated and monitored?
  • Is the manufacturer certified to ISO 13485?
  • How are materials sourced, checked and traced?

A manufacturer who answers these confidently, and with evidence, is far more likely to deliver consistent parts and fewer surprises.

FAQ’s

What is the most common injection moulding defect in medical device manufacturing?

Sink marks, short shots and flash are among the most frequent defects. Most of them trace back to the same root causes: uneven wall thickness, poor venting or cooling in the tool, worn tooling, or process settings that have drifted. Reviewing the design before the tool is made prevents most of them.

Can injection moulding defects be fixed once the tool has been made?

Yes, but it is usually more costly and time-consuming than getting it right first time. Small adjustments to process settings can resolve some issues. Additional venting and increasing gate size can be quite easily done.  In most cases you will start with the least amount of venting and the smallest gate and then increase, as venting can potentially lead to extra flash. This is why design for manufacture and a thorough tool design review matter so much at the start of a project.

How does a manufacturer prevent injection moulding problems in medical devices?

Prevention comes from a combination of good part and tool design, correct raw materials, a validated moulding process on suitable equipment, planned tool maintenance, and robust inspection and traceability. A manufacturer who controls injection moulding in-house is also better placed to spot and correct problems early.

What should I ask a contract manufacturer about their injection moulding quality?

Ask whether moulding is carried out in-house, whether designs are reviewed before tooling is cut, and how the process is validated and monitored. It is also worth asking about ISO 13485 certification, how materials are sourced and traced, and what happens if a parameter moves out of range during a production run.

Speak to a UK Medical Device Contract Manufacturing Expert

Meridian Medical has over 35 years of experience in medical device manufacturing, with in-house injection moulding and cleanroom assembly under one roof. Contact us today to discuss how Meridian Medical can support your next medical device project. Get in touch by filling out our online form or contacting us at 01903 732344 or info@meridian-medical.com.

Derek Massey, Tooling and Mouldshop Manager at Meridian Medical, responsible for precision mould design and manufacturing processes supporting single-use urology device production.
Author: Del Massey, Tooling and Mouldshop Manager

Del is a mechanical engineer with more than 33 years of experience in the design and programme management of plastic injection mould tools across the medical, military, and automotive sectors. He has specialised in automotive tooling within tier 1 and tier 2 environments, delivering strong technical leadership and reliable project execution.

He has a collaborative approach, with process‑driven thinking, and the ability to resolve complex design and tooling challenges efficiently, consistently supporting high‑quality, on‑time engineering outcomes.

Published 26/11/2026

FEATURED POSTS